I recently wrote the post “The Three Buckets model” for my own time. It reminded me of a similar model for how teams could spend their time.

Back in the day I had a product owner (PO) for a former team who used to start off our sprint planning sessions with

Here are the key product asks I think we should deliver this sprint. What team initiatives are you interested in driving?

I really loved this opening! I thought it was a great way to initiate a conversation between product and engineering - inviting everyone’s expertise to the table. It also brought a sense of autonomy, trust and shared ownership of the backlog.

In essence, we categorized every sprint task into these three categories:

  • Product asks
  • Team initiatives
  • Operational work (KTLO)

Let me go through the three categories in detail:

Product asks were the most important product-related features to be worked on. A product backlog can be infinitely long. As such, our PO would pick the 1-4 most important features that needed to be delivered. The PO made it very clear which ones were negotiable and which ones were not.

These tended to be slightly less strategic and of more urgent nature.

Team initiatives were initiatives that came from our engineering team. This could be dealing with technical debt, improving observability, building a proof of concept, improving our automated tests or test tooling, or constructing a new internal tool that would help us solve a specific problem in the future.

These initiatives also included non-technical tasks. There were product initiatives that came out of the team; Experiments we wanted to try with the product itself. I discovered that the more mature the product team is, the more product initiatives the engineers can come up with.

The team initiatives were naturally more strategic. By allowing team initiatives to be planned into the sprint, it allowed our team to ship at a sustained pace. It also gave us an opportunity to try out new things.

Operational work was urgent work that could not be postponed to another sprint. This included things like:

  • Keep The Lights On (KTLO). This could be like expanding our database disks to not run out of disk space, or optimizing memory usage to not run out of memory.
  • Fixing bugs.
  • Unblocking other teams.
  • Answering questions from internal teams or external customers.
  • Known unknowns such as “Hey, heads up that we might need to support team X with Y but we don’t know when or how”.
  • Unknown unknowns of things that naturally happened during the sprint we could by no means plan for (flooding in the datacenter? 😬😅).

Distribution between the categories? Link to heading

Over time, our aim was a 33%/33%/33% split between the categories, but we were flexible. Sometimes we had sprints which were more product-focused. Other sprints were more focused on doing operational work or team initiatives.

The one rule we had, though, was that we always at least had one task from each category. Without this rule, we would risk ending up doing short-term product tasks only - or simply spend our entire days refactoring our systems to the perfect rocket ship when we really needed an airplane.

“Will we make it?” Link to heading

Once we had our candidate tasks, we had an open and safe conversation about whether we thought we would be able to deliver all tasks. If needed, we prioritized and pruned tasks to try to avoid overplanning. If we felt like we had underplanned, we brought in more tasks.

“We are all product” Link to heading

A former manager always used to tell me

Jens, we are all product.

By saying this, he was reminding me that “the product and engineering” shared the same goal; building an awesome product together. By having these three categories for team work, I found that product and engineering started working much closer together, with the same goal in mind, focusing on the right thing, at the right time.